Yep, got in the floor last weekend. Still need to do the kick-board, but it's fairly amazing how much it is now looking like a bathroom and not just a construction site. Flooring goes a long way to help that.
So plans for this weekend include: base boards (kick boards? what's the correct term?), working on the pocket-door trim and maybe installing the pocket door. A great thing about the pocket door is that it won't have to be in the way once it's installed.
We'll also need to seal the travertine this weekend. Want to do that as soon as possible. May also work on more tile: the back of the tub and maybe the window sill. In other words, the difficult bits. May start up the shower wall, too. We were sort of waiting for the glass to show up, but there's been no word from the glass company, so we might as well move on.